Hybrid power

Reliable continuous power with additional capacity for short-term peaks

Some operations have a relatively stable power demand, combined with short periods in which significantly more power is required. Designing the complete energy system around these occasional peaks can result in unnecessary capacity and cost. Our Hybrid power system reduces costs for these operations. 

We’ll get in touch to understand your needs and assess whether one of our solutions could be the right fit.

ChatGPT Image Aug 11, 2026, 02_00_55 PM
Bouwplaats bouwrijp maken terrein groot

Continuous performance with flexible peak capacity

Designed around your power profile, the ONENSYS Hybrid Power solution combines hydrogen and battery technology to deliver reliable continuous power while efficiently supporting periods of increased demand.

The ONENSYS hybrid power solution combines the H2-Powergen with a battery system supplied through our technology partners. The H2-Powergen provides the continuous power required for day-to-day operations, while the battery supports short-duration peak loads.

How the hybrid system works

When demand is lower, available power from the H2-Powergen is used to recharge the battery. When demand rises, the battery releases this stored energy to provide additional power. This makes the setup particularly suitable for applications such as fast-charging electric construction equipment, vehicles or machinery.

Continuous power

The H2-Powergen supplies the stable, ongoing power demand of the operation.

Battery charging

During periods of lower demand, the H2-Powergen uses its available capacity to charge the battery.

Peak support

When power demand temporarily increases, the battery provides additional capacity without requiring the H2-Powergen to be sized for the full peak load.

ChatGPT Image Aug 11, 2026, 01_55_39 PM
ChatGPT Image Aug 11, 2026, 01_42_31 PM

Key benefits

*Depending on the construction project and use case, contact us for more information or read more about the SPUK SEB

Onensys – H2-Powergen11

Designed around your power profile

ONENSYS assesses your continuous power demand, peak loads, operating hours and charging requirements. Based on this profile, we configure the H2-Powergen capacity and coordinate the appropriate battery system with our partners. Depending on the selected battery system and required peak power, the hybrid power system can be configured to deliver peak power of 1 MW or more.

We manage the complete onsite power setup, including system configuration, deployment, operational support and facilitation of hydrogen supply. This allows contractors and project teams to focus on their work while we ensure reliable zero-emission power onsite.

Interested in Hybrid Power?

Contact us to discuss your project, power requirements and site conditions. Our team will help you determine which H2-Powergen set-up is the right solution for your application.

Onensys – H2-Powergen43

Frequently asked questions

The grid connection for my project is delayed — can ONENSYS provide power in the meantime?

Yes — this is one of the most common situations we solve. We assess your power demand and configure an onsite energy system that delivers the capacity you need while the grid connection is unavailable, insufficient or not yet ready, so your project can start on time.

No. Our systems operate off-grid and grid-connected. For temporary and mobile projects we provide reliable power without depending on fixed infrastructure, and the setup can move with your project.

Yes. We configure zero-emission onsite power that supports compliance with Natura 2000 restrictions, SEB requirements and procurement criteria — without bringing your operation to a halt. Where conventional generators are no longer allowed, this is exactly the gap we fill.

Many projects face several overlapping constraints: limited grid capacity, emission requirements and tight timelines. Contact us to assess your onsite power challenge. We evaluate your energy and power demand, grid situation and emission requirements, then explore the right power setup for your site.

Depending on the project and operating requirements, ONENSYS can agree contracted performance levels covering areas such as power availability, monitoring, maintenance and service response. The exact commitments and conditions are defined in the project agreement.